Bring on the Subs and Trades!

With the heat of summer brought more construction progress. Roughing in of the plumbing and electrical throughout the house has occurred.  Also Bob put in some sweat equity with the Ethernet, speaker and security camera cables. Concrete was poured for the front and back porches’ floor surface. The chimney received the outer brick façade and…

Clearing off my land

Just wanted to share some of the lot surveying and building perimeter markings for the Bob and Wayne’s project at 2120 W Trade. And below are some of the trees that had to be removed to make room for the house and garage.  Thankfully, three old tall trees were able to be saved and will…